Mangal
City
200+
Plots
4.62 ha
Area
2022
Est.
RERA
Approved
25+ yrs
Legacy
Regulatory compliance
RERA registration number will be displayed here once confirmed.
- RERA approved
- T&CP approved
- Vastu approved
Registration certificate scan(s) — confirm the current registration on MP RERA .
The Mangal City project was launched in 2022 with TNCP and RERA approval. The colony sits at the base of Mangal Giri Teerth, spans about 4.62 hectares, and offers 200+ plots in a secure campus with 24-hour surveillance and a distinctive ladder-style garden layout.
Walkways, water supply, sewage, and 9–12 m internal roads support daily movement; the development has seen strong sales with limited plots still available. Contact the office for current availability and site visits.
Gallery
10 photos of Mangal City. Click to enlarge.
Construction progress
Timeline of development milestones for Mangal City.
-
Project launch and layout approval
Completed2022
RERA registration and T&CP layout approval obtained; site work began at the base of Mangal Giri Teerth.
-
Phase 1 roads and infrastructure
Completed2023
9–12 m internal roads, walkways, underground drainage, and water supply for Phase 1.
-
Entrance, surveillance, and ladder-style gardens
Completed2024
Grand entrance with security checkpoint, CCTV coverage, and the distinctive ladder-based garden design.
-
High uptake and Phase 2 landscaping
In progress2025
Strong sales with limited plots remaining; remaining parcels and green belts under active development.
Location
Area from search — confirm before travelling.